建站实录:.si 域名从注册到上线的 24 小时
fusi.si's actual build timeline — not a tutorial but a timestamped log of real steps and pitfalls.
Phase 1: domain & direction
Register the domain, confirm via WHOIS, then lock the site direction. We pivoted from a for-sale page to an AI review content site — the pivot reshaped the whole structure.
Phase 2: build & deploy
- 首页 + 目录 + 内容页 + 合规页
- 命令行一键推,拿到 pages.dev 预览地址
- 注册商改 NS,Pages 挂自定义域名
Phase 3: SEO & content
Inject Open Graph / JSON-LD / hreflang in bulk, generate sitemap & robots, add the EU-mandated cookie consent, then keep publishing content.
Phase 4: troubleshoot
Two typical post-launch issues: the domain still showing the old page (DNS cache) and search engines needing an explicit submit. Solved by forcing authoritative IPs and submitting the sitemap.
Reusable lessons
- 顺序不能反,绑定依赖 NS 生效
- 配置 / 解析 / 缓存,定位对症下药
- SEO 与合规是门票,原创内容才是过审关键
The timeline
- Step 1:注册域名,等 WHOIS 落地确认注册成功(原本显示「注册中」)。
- Step 2:确定方向(此处从「出售页」改为「评测内容站」),搭好首页/目录/内容页/合规页。
- Step 3:部署到 Pages 拿到预览地址,再把域名 NS 改到 Cloudflare,绑定自定义域名。
- Step 4:批量注入 SEO、生成 sitemap/robots、配 Cookie 同意与隐私政策。
- Step 5:持续扩充内容并排查上线后问题(DNS 缓存、搜索引擎收录)。
Wrong turns
- Set direction first:中途从出售页改评测站,等于重做结构,一开始就该想清楚。
- Binding order:区域 pending 时绑自定义域名导致记录没写全,后来删掉重加才解决。
- Cache illusion:以为上线了,其实是本地 DNS 缓存,浪费了排查时间。
What I'd do differently
- Content before chrome:确认有 10+ 篇内容再设计站点结构。
- Wait for active:等区域 active 再加自定义域名。
- Use a generator:内容多时模板化生成,保证一致且省时。
Cost & time
The only cost was the domain; hosting was free. Roughly an hour from registration to a live site, excluding content creation. For a content site, the real cost is time, not money.
Real case: the key trade-off behind this log
The pivotal decision: starting as a domain for-sale page, then pivoting to an AI tool review content site. It meant rebuilding the structure — but it is what gave the site a sustainable content engine instead of a one-off sale.
- If redone:先写满 10+ 篇内容再设计站点结构,能省掉一次大改。
- Time ledger:域名到上线约 1 小时,SEO 与合规基建约 1 小时,之后每天的边际成本就是写内容本身。