Guides › 建站实录:.si 域名从注册到上线的 24 小时

建站实录:.si 域名从注册到上线的 24 小时

Updated: Oct 2026建站实战

fusi.si's actual build timeline — not a tutorial but a timestamped log of real steps and pitfalls.

Phase 1: domain & direction

Register the domain, confirm via WHOIS, then lock the site direction. We pivoted from a for-sale page to an AI review content site — the pivot reshaped the whole structure.

Phase 2: build & deploy

Phase 3: SEO & content

Inject Open Graph / JSON-LD / hreflang in bulk, generate sitemap & robots, add the EU-mandated cookie consent, then keep publishing content.

Phase 4: troubleshoot

Two typical post-launch issues: the domain still showing the old page (DNS cache) and search engines needing an explicit submit. Solved by forcing authoritative IPs and submitting the sitemap.

Reusable lessons

The timeline

Wrong turns

What I'd do differently

Cost & time

The only cost was the domain; hosting was free. Roughly an hour from registration to a live site, excluding content creation. For a content site, the real cost is time, not money.

launch-timeline.svg
Diagram · launch-timeline.svg

Real case: the key trade-off behind this log

The pivotal decision: starting as a domain for-sale page, then pivoting to an AI tool review content site. It meant rebuilding the structure — but it is what gave the site a sustainable content engine instead of a one-off sale.

Advertisement
Ad slot

Related tools